 |
 |
 |
| Business Area |
 |
Core Projects |
 |
 |
 |
| Water treatment |
 |
Sewage treatment facility: Sewage terminal treatment
facility construction and general pilot operation |
| |
 |
Waste water treatment facility: Efficient design/construction/pilot
operation by materials and production process |
| |
 |
Individual sewage treatment facility: Sewage/night
soil/livestock sewage treatment design and construction |
 |
 |
 |
| Waste water recycling |
 |
Partnership, process design, and construction
for top technology in reuse of wastewater (UF, RO, etc.) |
 |
 |
 |
| Air pollution prevention facility |
 |
Design/construction/pilot operation of flue gas
treatment system for industrial plants |
| |
 |
applied industries: Denitrification facility (SCR),
incinerator and exhaust gas reduction facility |
| |
 |
- Volatile organic compounds
(VOC) reduction facility |
| |
 |
- Filter dust collection
facility design and construction / air pollution prevention
facility consulting |
 |
 |
 |
Recycling facility
(Incinerator)
|
 |
Waste resource recovery facility construction/pilot
operation |
 |
Exhaust gas reduction facility |
 |
 |
 |
| Automatic Cleaning |
 |
Automatic waste collection facility design/construction/pilot
operation |
| |
 |
Applied industries |
| |
 |
- Large apartment complexes,
large hospitals, multipurpose buildings, etc. |
 |
 |
 |
| Bio Gas |
 |
Design/construction/pilot operation of anaerobic
incineration facility for high density organic waste |
| |
 |
Applied industries: Farming complexes, landfills,
etc. |
 |
 |
 |
 |
 |
 |
| Year of Construction |
 |
Project Name |
 |
 |
 |
| 2008 |
 |
Hyundai Steel: Machine piping installation in
hot rolling/ thick plate water treatment works |
| |
 |
Dongguk Steel: Sand filter production and installation
for thick plate plant¡¯s water treatment facility |
| |
 |
LG Display: Gumi¡¯s P6E environment electrical
instrumentation works |
| |
 |
Sinwolseong Nuclear Power: Unit 1 and 2 wastewater
purification and vacuum transportation facility installation
|
| |
 |
Seongnam Pangyo waste transportation facility
construction (Zone 3) |
 |
 |
 |
| 2007 |
 |
Gunsan advanced waste water treatment machinery
piping works |
| |
 |
Jeju advanced waste water treatment electrical
works |
| |
 |
Goyang Ilsan advanced waste water treatment machinery
piping /electrical works |
| |
 |
Namgang Dam upstream sewage plant (zone 1) machinery
piping works |
| |
 |
Seoul Dairy Cooperative Union Yangju Plant wastewater
treatment facility improvement |
| |
 |
Yangju Nambang sewage treatment plant¡¯s stage
2 machinery piping works |
| |
 |
Gwangneung¡¯s sewage piping revamp works and installation
|
| |
 |
Osan sewage recycling electrical instrumentation
works |
 |
 |
 |
| 2006 |
 |
LG LCD P8 environment electrical / facility works
|
| |
 |
LG Siltron Plant 3 environmental facility, electrical
/ instrumentation expansion |
| |
 |
Osan Sewage Treatment Plant 2 facility and instrumentation
works |
| |
 |
Yeosu Jungheung wastewater treatment plant expansion
and advanced waste water treatment machinery piping works |
| |
 |
Jeju advanced waste water treatment machinery
piping works |
 |
 |
 |
| 2005 |
 |
Yangju Nambang sewage treatment plant construction |
| |
 |
Mado local industrial complex wastewater terminal
treatment plant construction |
| |
 |
LG/Lotte Daesan Yuhwa ODOR/VOC reduction facility
construction |
| |
 |
Jeonju sewage intense treatment machinery works |
| |
 |
Busan grain landfill¡¯s leachate treatment machinery
piping works |
 |
 |
 |
| 2004 |
 |
LG Philips LCD P1 environmental facility expansion |
 |
 |
 |
| 2003 |
 |
Recycling equipment in LG Philips LCD P5 environmental
facility |
 |
 |
 |
| 2002 |
 |
LG LCD plant 2,3: Duct, UT facility and waste
liquid tank installation in organic wastewater improvement works |
| |
 |
Recycling equipment in P4 environmental facility |
| |
 |
Heeseong Engelhardt
Sihwa Plant denitrification facility installation |
 |
 |
 |
| 2001 |
 |
Recycling facility in LG Philips LCD P4 environmental
facilities |
 |
 |
 |