HomeContact UsSiteMapKOREAN
Home > Business Fields > Communication System > Railway Signal
Railways are the heart of the nation's transportation system in Korea. From the design and conception of signals to the construction and function testing, GS Neotek manages the total in railway signals.
The long history of GS Neotek high quality construction has brought credibility and deep trust from clients, showcased recently by the participation in the signals installation project of the nation's first high-speed railway.

Possessing the expertise that's in sync with developing electronic science, GS Neotek not only contributes to the progress of signaling technology, but also asserts itself as a leading company in the field through the construction of a comprehensive signaling system that provides both technology and convenience.

Moreover, recently Korea National Railroad ("KNR") is planning to adopt advanced signaling system. In order to cope with this plan by KNR, GS Neotek is strategically collaborating with a supplier of that system in and out of Korea.

GS Neotek is carrying out the designing, installing the mechanical room and controlling systems as core areas of signaling
Business Area
CTC(Centralized Traffic Control)
Relay/Electronic Interlocking System
ABS(Automatic Block System)
ATS(Automatic Train Stop)
ATC(Automatic Train Control)
TTC(Total Traffic Control)
IIndoor/Outdoor Equipment
Year Project
2005~present Kyeongchun Railway Geumgok~Chuncheon signal
2008~present Jeolla Railway Suncheon ~Yeosu signal
2006~2008 Subway Line 9 communication signal
2004~2008 Ori ~Bundang signal equipment installation works
2004~2006 Gyeongbu High Speed Railway, new line signal equipment maintenance works
2001~2003 Gyeongbu High Speed Railway, South Seoul ~ Daejeon signal equipment installation works
1998~2005 Gyeongbu 2 double track railway, Osan~Pyeongtaek signal equipment installation works
1998~2001 Gyeongbu High Speed Railway, pilot line signal equipment installation works
1993~2000 Seoul metropolitan area integrated command center project
1993~1995 Bundang railway, Suseo~Bundang signal equipment installation works
1988~1989 Seoul metropolitan area CTC command equipment construction
1982~1984 Subway Lines 3, 4, command equipment installation
   
System Equipment
Year Project
2008~present Seoul Metro Rapid Transit Corporation Lines 5,7 PSD
2006~present Uijeongbu Light Railway, PSD/AFC installation
2006~2008 Busan Subway Platform Screen Door
2003~2006 Cheongnyangni ~ Deokso Electronic Signal System
2000~2006 Emun electronic car depot signal construction